Energy assessment for the energy performance reduction project

The subject of the energy assessment was the evaluation of the project for the reduction of energy consumption consisting in the gasification of the Mařatice heating plant – the construction of three gas-fired steam boilers and a 999 kWe KGJ.

Location: CTZ s.r.o., Uherské Hradiště

This energy assessment has been prepared in accordance with Section 9a para. 1 lit. d) of Act 406/200 Coll. as a basis for submitting an application for support from the Modernisation Fund.

Other examples of successful cooperation

Fatra Napajedla
Fatra, a.s, Napajedla

Modernization of central heat distribution systems

The subject of the energy assessment was the evaluation of the project for the reduction of…

TEDOM a.s.

Reducing nitrogen emissions on a CHP unit

Thanks to the use of the denitrification method SCR (Selective Catalytic Reduction), the CHP unit at…

EKOL, spol. s r.o. (Kaweczyn Heating Plant, Poland)

Reduction of nitrogen emissions by selective catalytic reduction

Thanks to the use of the SCR (Selective Catalytic Reduction) denitrification method, the two hot water…